2005

IAP is awarded a major contract for wastewater treatment odor control equipment in Los Angeles County. Besides two 1250 hp fans, the project scope includes a number of other fans, motors, VFDs, silencers, oil circulations systems, and numerous other ancillary equipment. 

Categories: